The problem
The entrance to this logistics yard had fallen into disrepair. With constant HGV movements, that meant a safety risk for drivers and pedestrians, wear on the fleet, and a poor first impression for everyone arriving on site.
What we did
- 100m² of new reinforced concrete across the yard entrance
- Reinforced throughout for constant HGV loading
- Brushed, slip-resistant finish
- Tight two-week programme to limit the impact on access
The result
A safe, solid entrance that the site can rely on long term, finished on time with minimal disruption.
We've been really impressed with your team and how they've got on with the work, disruption has been kept to a minimum which on a site like ours really matters. Finished on time and the result is exactly what we needed. Really glad we came to you. Thank you.