The problem
A school in Manchester was getting a new modular building. Before it could be craned into position, the site had to be fully prepared, all within a tight two-week programme.
What we did
- Foundation pads to receive the modular structure
- Drainage connections and electrical trenching
- Concrete skirting around the building perimeter
- Access ramps installed before and after the crane lift
The result
Delivered on programme, leaving a clean, ready site for the building to be craned in and commissioned, and accessible and compliant from day one.
Your team came in and got everything sorted ahead of the crane arriving. Really happy with how it all went, thanks very much