The problem
A long-standing client in Stockport needed to redevelop their whole yard to improve efficiency and safety and future-proof the space. The yard was in daily use, so any downtime would have hit productivity and service delivery directly.
What we did
- New drainage systems
- Improved traffic routes
- Reinforced yard concreting for heavy daily use
- Phased works planned around the client's operation
- Vehicle and pedestrian movements controlled with the client's health and safety leads
The result
A completely revitalised yard with smoother vehicle flow and higher safety standards, built for the business's growing demands. We handled every stage in-house, from design and planning to the final pour, and the site never stopped.
Twelve months on a live site is no small thing but you managed it well throughout. The new yard is already making a difference to how we operate day to day. Great work





