Concrete yard repairs and wash bay
  1. Home
  2. Projects
  3. Wigan
ManufacturingConcrete repairsDrainage

Concrete yard repairs and wash bay

538m² of new reinforced concrete, drainage repairs and a wash bay pit twice the size, phased in three areas so the yard kept working.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • 326 Sites Delivered
Client
LocationWigan
SectorManufacturing
Programme5 weeks
Concrete538m²
Site statusOpen throughout
01

The problem

Liebherr's yard in Wigan needed worn concrete slabs replaced, its gullies and drainage repaired, and a bigger wash bay, without closing the yard to the plant and vehicles that use it every day.

02

What we did

  • Jetting and CCTV survey of all the yard drainage before and after the works
  • Existing slabs saw cut, broken out and removed from site, in three areas, one at a time
  • New 250mm C40 slabs with mesh, dowelled into the existing concrete and brush finished
  • Gullies repaired and moved, with new connections to the existing pipework
  • Wash bay pit rebuilt at twice the size, 5m by 1.2m by 1m deep, with a heavy duty grated cover
03

The result

Liebherr now has new, brush-finished slabs across the repaired areas, drainage that has been cleared and checked on camera, and a wash pit with twice the capacity. The works moved through the yard one area at a time, so the rest of it stayed open throughout.

On site

4 photos. Click any photo to enlarge.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.

Call usSend your brief